We supply and install lay-in grid and tile systems for commercial offices, education and healthcare projects, offering both functional and aesthetic finishes.
Design and coordination: Our design team confirms ceiling heights, grid layouts and service zones during pre-construction to ensure coordination with mechanical, electrical and lighting layouts.
Delivery: Ceilings are installed by trained operatives under structured supervision, with resource plans mapped to access windows and delivery slots.
Quality and evidence: Daily inspections and digital records capture material traceability and installation progress, producing a clean, single quality assurance pack at handover.
Outcomes: Reliable ceiling alignment, service integration without rework and a professional finish that passes inspection first time.
ENQUIRE ABOUT OUR SUSPENDED CEILINGSWe install specialist metal pan ceilings for data centres, clean environments and high-specification commercial spaces where precision, access and hygiene are critical.
Design and integration: Our in-house design team works with manufacturers to confirm panel configurations, suspension systems and access requirements before site start.
Sequencing: The in-house planner integrates ceiling works into the main contractor’s master programme, ensuring coordination with other trades and avoiding congestion at high-level.
Performance and compliance: Each installation is delivered using tested components, with fix-first inspection routines and recorded product certification to support Building Safety documentation.
Outcomes: Precision installations, guaranteed performance, and a documented trail from design through to completion.
ENQUIRE ABOUT OUR SUSPENDED CEILINGS
Please feel free to get in contact with us through our form, or the below details.
Middlesex Limited
Darwin House
Bourne End Business Park
Cores End Road
Bourne End, SL8 5AS
We install lay-in grid and tile systems for commercial and institutional environments, as well as specialist metal pan tiled systems for clean areas, data centres and high-specification spaces.
Our design team confirms ceiling levels, service zones and penetrations before work begins. We maintain an interface ownership matrix to clarify responsibilities between mechanical, electrical and finishing trades.
Yes. Our in-house planner sequences ceiling works around access windows and night shifts, ensuring continuous progress and minimal disruption to live environments.
Supervisor coverage is planned for every phase. A dedicated QA lead and document controller maintain daily photo evidence, material logs and completion records, compiled into a single digital QA pack.
Yes. All systems are installed using tested and certified products, and our documentation structure captures full product traceability and inspection evidence to support Building Safety submissions.